Our new Project Cemre NB72..

DEME is investing in its first Service Operation Vessel (SOV) for wind farm maintenance. Concepted by DEME and further designed in close cooperation with Vuyk Engineering Rotterdam and Marin, this innovative vessel significantly improves safety, comfort, and workability for wind farm technicians even in the roughest sea conditions. The keel-laying ceremony took place on December 13 at CEMRE SHIPYARD in Yalova, Turkey.

The SOV will feature a Small Waterplane Area Twin Hull (SWATH) design, which ensures low wave impact on movements when approaching the wind turbines, compared to a mono-hull SOV. The vessel will enable safe crew transfers in significant wave heights of up to 2.5 m, being the first DP2, twin-hulled SOV in the world.

At 60 m long, the SOV will be equipped with a motion-compensated gangway and daughter craft to safely transfer technicians to the wind turbines, increasing the workability and logistics capabilities of the vessel. It is also designed according to the latest comfort standards, allowing the vessel to be a homely offshore base for up to 24 technicians and a nautical crew.

Environmental considerations are an important element of the vessel design with, amongst others, a waste heat recovery system and a Clean Design notation. With the provided DP2 technology the vessel can hold its position in rough sea conditions but still operate with lower fuel consumption when compared to traditional SOVs.

We signed contract with Cemre shipyard about all the navigation, communication, entertainment and IT systems of the project management, supply of equipment, wiring, installation and commissioning workmanship,

We would like to thank Cemre shipyard and Deme company for choosing us.

Başa dön